Join today

PT6A-60A | King Air B300/B300C Engine-Control Rigging

Build evidence-based rigging decisions for the standard King Air B300/B300C PT6A-60A installation. Study the 55-page Rev E manual and actual maintenance-manual figures, complete 15 guided stages, and diagnose integrated faults from baseline through adjustment, repeat proof and restoration. Demonstrate independent job decisions and pass the 50-question final. Online knowledge completion is separate from observed practical qualification.

What's included?

  • 15 guided rigging stages
  • Online completion certificate
  • 50-question final · 80% to pass
  • 7 integrated fault cases + independent assessment
  • 55-page manual · actual source figures

Understand the adjustment and its consequences

Trace power, condition and propeller control paths. Practise dry geometry, deadband position and width, idle branches, reverse, governing, torque and beta proof. Each guided stage connects prediction, action, diagnosis and restoration to an identified manual task.

Diagnose and prove the complete job

Work through seven integrated fault cases, then solve an unnamed independent case. Record the as-found condition, choose the source-supported branch, repeat invalidated checks and restore the system. Completion requires all 15 guided passes, an independent job pass and the 50-question final at 80%. Saved progress, hints and page-specific Manual Help support remediation.